Introduced:
Jun 18, 2025
Policy Area:
Armed Forces and National Security
Congress.gov:
Bill Statistics
2
Actions
0
Cosponsors
0
Summaries
1
Subjects
1
Text Versions
Yes
Full Text
AI Summary
AI Summary
No AI Summary Available
Click the button above to generate an AI-powered summary of this bill using Claude.
The summary will analyze the bill's key provisions, impact, and implementation details.
Error generating summary
Latest Action
Jun 18, 2025
Read twice and referred to the Committee on Armed Services.
Actions (2)
Read twice and referred to the Committee on Armed Services.
Type: IntroReferral
| Source: Senate
Jun 18, 2025
Introduced in Senate
Type: IntroReferral
| Source: Library of Congress
| Code: 10000
Jun 18, 2025
Subjects (1)
Armed Forces and National Security
(Policy Area)
Full Bill Text
Length: 2,839 characters
Version: Introduced in Senate
Version Date: Jun 18, 2025
Last Updated: Nov 18, 2025 2:16 AM
[Congressional Bills 119th Congress]
[From the U.S. Government Publishing Office]
[S. 2105 Introduced in Senate
(IS) ]
<DOC>
119th CONGRESS
1st Session
S. 2105
To require the Secretary of the Air Force to conduct planning and
design activities for Tye Gate and Arnold Gate infrastructure
improvements at Dyess Air Force Base, and for other purposes.
_______________________________________________________________________
IN THE SENATE OF THE UNITED STATES
June 18, 2025
Mr. Cruz introduced the following bill; which was read twice and
referred to the Committee on Armed Services
_______________________________________________________________________
A BILL
To require the Secretary of the Air Force to conduct planning and
design activities for Tye Gate and Arnold Gate infrastructure
improvements at Dyess Air Force Base, and for other purposes.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
[From the U.S. Government Publishing Office]
[S. 2105 Introduced in Senate
(IS) ]
<DOC>
119th CONGRESS
1st Session
S. 2105
To require the Secretary of the Air Force to conduct planning and
design activities for Tye Gate and Arnold Gate infrastructure
improvements at Dyess Air Force Base, and for other purposes.
_______________________________________________________________________
IN THE SENATE OF THE UNITED STATES
June 18, 2025
Mr. Cruz introduced the following bill; which was read twice and
referred to the Committee on Armed Services
_______________________________________________________________________
A BILL
To require the Secretary of the Air Force to conduct planning and
design activities for Tye Gate and Arnold Gate infrastructure
improvements at Dyess Air Force Base, and for other purposes.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
SECTION 1.
This Act may be cited as the ``Dyess Air Base Access Infrastructure
Design Act''.
SEC. 2.
DYESS AIR FORCE BASE, TEXAS.
(a) Tye Gate Design.--
(1) In general.--The Secretary of the Air Force shall carry
out planning and design activities for an infrastructure
project relating to the Tye Gate at Dyess Air Force Base,
Texas.
(2) Amount of project.--The infrastructure project for
which planning and design activities are required under
paragraph
(1) shall be for an amount not to exceed $17,000,000,
of which planning and design may not exceed seven percent.
(3) Design activities.--Design activities required under
paragraph
(1) may be based on standard Air Force gate designs
and shall consider minimal utility crossings, limited conflicts
with built infrastructure, and simplified phasing.
(b) Arnold Gate Design.--
(1) In general.--The Secretary shall carry out planning and
design activities for an infrastructure project relating to the
Arnold Gate at Dyess Air Force Base, Texas.
(2) Amount of project.--The infrastructure project for
which planning and design activities are required under
paragraph
(1) shall be for an amount not to exceed $12,065,000,
of which planning and design may not exceed eight percent.
(3) Design activities.--Design activities required under
paragraph
(1) shall account for site congestion, multiple
utility connections, phased construction, and complex traffic
coordination.
(c) Use of Existing Amounts.--The requirements under this section
shall be carried out using amounts otherwise made available to the
Department of the Air Force for planning and design under military
construction accounts.
<all>
(a) Tye Gate Design.--
(1) In general.--The Secretary of the Air Force shall carry
out planning and design activities for an infrastructure
project relating to the Tye Gate at Dyess Air Force Base,
Texas.
(2) Amount of project.--The infrastructure project for
which planning and design activities are required under
paragraph
(1) shall be for an amount not to exceed $17,000,000,
of which planning and design may not exceed seven percent.
(3) Design activities.--Design activities required under
paragraph
(1) may be based on standard Air Force gate designs
and shall consider minimal utility crossings, limited conflicts
with built infrastructure, and simplified phasing.
(b) Arnold Gate Design.--
(1) In general.--The Secretary shall carry out planning and
design activities for an infrastructure project relating to the
Arnold Gate at Dyess Air Force Base, Texas.
(2) Amount of project.--The infrastructure project for
which planning and design activities are required under
paragraph
(1) shall be for an amount not to exceed $12,065,000,
of which planning and design may not exceed eight percent.
(3) Design activities.--Design activities required under
paragraph
(1) shall account for site congestion, multiple
utility connections, phased construction, and complex traffic
coordination.
(c) Use of Existing Amounts.--The requirements under this section
shall be carried out using amounts otherwise made available to the
Department of the Air Force for planning and design under military
construction accounts.