119-s182

S
✓ Complete Data

Northwest Energy Security Act

Login to track bills
Introduced:
Jan 22, 2025
Policy Area:
Water Resources Development

Bill Statistics

2
Actions
5
Cosponsors
0
Summaries
9
Subjects
1
Text Versions
Yes
Full Text

AI Summary

No AI Summary Available

Click the button above to generate an AI-powered summary of this bill using Claude.

The summary will analyze the bill's key provisions, impact, and implementation details.

Latest Action

Jan 22, 2025
Read twice and referred to the Committee on Environment and Public Works.

Actions (2)

Read twice and referred to the Committee on Environment and Public Works.
Type: IntroReferral | Source: Senate
Jan 22, 2025
Introduced in Senate
Type: IntroReferral | Source: Library of Congress | Code: 10000
Jan 22, 2025

Subjects (9)

Alternative and renewable resources Dams and canals Electric power generation and transmission Idaho Lakes and rivers Montana Oregon Washington State Water Resources Development (Policy Area)

Cosponsors (5)

(R-WY)
Jan 22, 2025
(R-ID)
Jan 22, 2025
(R-MT)
Jan 22, 2025
(R-MT)
Jan 22, 2025

Text Versions (1)

Introduced in Senate

Jan 22, 2025

Full Bill Text

Length: 3,625 characters Version: Introduced in Senate Version Date: Jan 22, 2025 Last Updated: Nov 15, 2025 2:16 AM
[Congressional Bills 119th Congress]
[From the U.S. Government Publishing Office]
[S. 182 Introduced in Senate

(IS) ]

<DOC>

119th CONGRESS
1st Session
S. 182

To provide for operations of the Federal Columbia River Power System
pursuant to a certain operation plan for a specified period of time,
and for other purposes.

_______________________________________________________________________

IN THE SENATE OF THE UNITED STATES

January 22, 2025

Mr. Risch (for himself, Mr. Daines, Mr. Sheehy, Mr. Crapo, Ms. Lummis,
and Mr. Barrasso) introduced the following bill; which was read twice
and referred to the Committee on Environment and Public Works

_______________________________________________________________________

A BILL

To provide for operations of the Federal Columbia River Power System
pursuant to a certain operation plan for a specified period of time,
and for other purposes.

Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
SECTION 1.

The Act may be cited as the ``Northwest Energy Security Act''.
SEC. 2.

In this Act:

(1) FCRPS.--The term ``FCRPS'' means those portions of the
Federal Columbia River Power System that are the subject of the
Supplemental Opinion.

(2) Secretaries.--The term ``Secretaries'' means--
(A) the Secretary of the Interior, acting through
the Commissioner of Reclamation;
(B) the Secretary of Energy, acting through the
Administrator of the Bonneville Power Administration;
and
(C) the Secretary of the Army, acting through the
Chief of Engineers.

(3) Supplemental opinion.--The term ``Supplemental
Opinion'' means the document entitled ``Columbia River System
Operations Environmental Impact Statement Record of Decision''
and dated September 2020.
SEC. 3.

The Secretaries shall operate the FCRPS in a manner consistent with
the reasonable and prudent alternative described in the Supplemental
Opinion.
SEC. 4.

(a) In General.--Notwithstanding
section 3, the Secretaries may amend portions of the Supplemental Opinion and operate the FCRPS in accordance with those amendments if all of the Secretaries determine, in the sole discretion of each Secretary, that-- (1) the amendment is necessary for public safety or transmission and grid reliability; or (2) the actions, operations, or other requirements that the amendment would remove are no longer warranted.
amend portions of the Supplemental Opinion and operate the FCRPS in
accordance with those amendments if all of the Secretaries determine,
in the sole discretion of each Secretary, that--

(1) the amendment is necessary for public safety or
transmission and grid reliability; or

(2) the actions, operations, or other requirements that the
amendment would remove are no longer warranted.

(b) Restriction on Amendments.--The process described in subsection

(a) shall be the only method by which the Secretaries may operate the
FCRPS in any way that is not consistent with the reasonable and prudent
alternative set forth in the Supplemental Opinion.
SEC. 5.
CLARIFICATION.

(a) Restricting FCRPS Electrical Generation.--No structural
modification, action, study, or engineering plan that restricts
electrical generation at any FCRPS hydroelectric dam, or that limits
navigation on the Snake River in the State of Washington, Oregon, or
Idaho, shall proceed unless such proposal is specifically and expressly
authorized by a Federal statute enacted after the date of the enactment
of this Act.

(b) Clarification.--Nothing in this section affects or interferes
with the authority of the Secretaries to conduct operation and
maintenance activities or make capital improvements necessary to meet
authorized project purposes of FCRPS facilities.
<all>