HYDROPOWER PROJECTS.
(a) Definition of Covered Project.--In this section, the term
``covered project'' means a hydropower project with respect to which
the Federal Energy Regulatory Commission issued a license before March
13, 2020.
(b) Authorization of Extension.--Notwithstanding
Introduced:
Mar 13, 2025
Policy Area:
Energy
Congress.gov:
Bill Statistics
9
Actions
7
Cosponsors
0
Summaries
6
Subjects
2
Text Versions
Yes
Full Text
AI Summary
AI Summary
No AI Summary Available
Click the button above to generate an AI-powered summary of this bill using Claude.
The summary will analyze the bill's key provisions, impact, and implementation details.
Error generating summary
Latest Action
Aug 1, 2025
at 10:02 AM
Held at the desk.
Actions (9)
Held at the desk.
Type: Floor
| Source: House floor actions
| Code: H15000
Aug 1, 2025
10:02 AM
10:02 AM
Received in the House.
Type: Floor
| Source: House floor actions
| Code: H14000
Aug 1, 2025
10:02 AM
10:02 AM
Message on Senate action sent to the House.
Type: Floor
| Source: Senate
Aug 1, 2025
Passed Senate without amendment by Unanimous Consent. (consideration: CR S4797-4798; text: CR S4797-4798)
Type: Floor
| Source: Senate
Jul 29, 2025
Passed/agreed to in Senate: Passed Senate without amendment by Unanimous Consent. (consideration: CR S4797-4798; text: CR S4797-4798)
Type: Floor
| Source: Library of Congress
| Code: 17000
Jul 29, 2025
Senate Committee on Energy and Natural Resources discharged by Unanimous Consent.
Type: Discharge
| Source: Senate
Jul 29, 2025
Senate Committee on Energy and Natural Resources discharged by Unanimous Consent.
Type: Committee
| Source: Library of Congress
| Code: 14500
Jul 29, 2025
Read twice and referred to the Committee on Energy and Natural Resources.
Type: IntroReferral
| Source: Senate
Mar 13, 2025
Introduced in Senate
Type: IntroReferral
| Source: Library of Congress
| Code: 10000
Mar 13, 2025
Subjects (6)
Alternative and renewable resources
Dams and canals
Electric power generation and transmission
Energy
(Policy Area)
Infrastructure development
Licensing and registrations
Cosponsors (7)
(R-PA)
Jul 31, 2025
Jul 31, 2025
(R-AK)
Mar 24, 2025
Mar 24, 2025
(R-LA)
Mar 13, 2025
Mar 13, 2025
(D-PA)
Mar 13, 2025
Mar 13, 2025
(R-LA)
Mar 13, 2025
Mar 13, 2025
(R-AK)
Mar 13, 2025
Mar 13, 2025
(R-MT)
Mar 13, 2025
Mar 13, 2025
Text Versions (2)
Full Bill Text
Length: 2,878 characters
Version: Engrossed in Senate
Version Date: Jul 29, 2025
Last Updated: Nov 17, 2025 6:08 AM
[Congressional Bills 119th Congress]
[From the U.S. Government Publishing Office]
[S. 1020 Engrossed in Senate
(ES) ]
<DOC>
119th CONGRESS
1st Session
S. 1020
_______________________________________________________________________
AN ACT
To require the Federal Energy Regulatory Commission to extend the time
period during which licensees are required to commence construction of
certain hydropower projects.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
[From the U.S. Government Publishing Office]
[S. 1020 Engrossed in Senate
(ES) ]
<DOC>
119th CONGRESS
1st Session
S. 1020
_______________________________________________________________________
AN ACT
To require the Federal Energy Regulatory Commission to extend the time
period during which licensees are required to commence construction of
certain hydropower projects.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
SECTION 1.
section 13 of the
Federal Power Act (16 U.
Federal Power Act (16 U.S.C. 806), on the request of a licensee of a
covered project, the Federal Energy Regulatory Commission may, after
reasonable notice and for good cause shown, extend in accordance with
subsection
(c) the period during which the licensee is required to
commence construction of the covered project for not more than an
additional 6 years beyond the 8 years authorized by that section.
(c) Period of Extension.--An extension of time to commence
construction of a covered project under subsection
(b) shall--
(1) consist of not more than 3 consecutive 2-year periods;
(2) begin on the date on which the final extension of the
period for commencement of construction granted to the licensee
under
covered project, the Federal Energy Regulatory Commission may, after
reasonable notice and for good cause shown, extend in accordance with
subsection
(c) the period during which the licensee is required to
commence construction of the covered project for not more than an
additional 6 years beyond the 8 years authorized by that section.
(c) Period of Extension.--An extension of time to commence
construction of a covered project under subsection
(b) shall--
(1) consist of not more than 3 consecutive 2-year periods;
(2) begin on the date on which the final extension of the
period for commencement of construction granted to the licensee
under
section 13 of the Federal Power Act (16 U.
expires; and
(3) end on the date that is not more than 6 years after the
latest date to which the Federal Energy Regulatory Commission
is authorized to extend the period for commencement of
construction under that section.
(d) Reinstatement of Expired License.--If the time period required
under
(3) end on the date that is not more than 6 years after the
latest date to which the Federal Energy Regulatory Commission
is authorized to extend the period for commencement of
construction under that section.
(d) Reinstatement of Expired License.--If the time period required
under
section 13 of the Federal Power Act (16 U.
construction of a covered project expires after December 31, 2023, and
before the date of enactment of this Act--
(1) the Federal Energy Regulatory Commission may reinstate
the license for the applicable project effective as of the date
of expiration of the license; and
(2) the extension authorized under subsection
(b) shall
take effect on the date of that expiration.
Passed the Senate July 29, 2025.
Attest:
Secretary.
119th CONGRESS
1st Session
S. 1020
_______________________________________________________________________
AN ACT
To require the Federal Energy Regulatory Commission to extend the time
period during which licensees are required to commence construction of
certain hydropower projects.
before the date of enactment of this Act--
(1) the Federal Energy Regulatory Commission may reinstate
the license for the applicable project effective as of the date
of expiration of the license; and
(2) the extension authorized under subsection
(b) shall
take effect on the date of that expiration.
Passed the Senate July 29, 2025.
Attest:
Secretary.
119th CONGRESS
1st Session
S. 1020
_______________________________________________________________________
AN ACT
To require the Federal Energy Regulatory Commission to extend the time
period during which licensees are required to commence construction of
certain hydropower projects.