Introduced:
Aug 1, 2025
Policy Area:
Armed Forces and National Security
Congress.gov:
Bill Statistics
3
Actions
0
Cosponsors
0
Summaries
1
Subjects
1
Text Versions
Yes
Full Text
AI Summary
AI Summary
No AI Summary Available
Click the button above to generate an AI-powered summary of this bill using Claude.
The summary will analyze the bill's key provisions, impact, and implementation details.
Error generating summary
Latest Action
Aug 1, 2025
Referred to the House Committee on Armed Services.
Actions (3)
Referred to the House Committee on Armed Services.
Type: IntroReferral
| Source: House floor actions
| Code: H11100
Aug 1, 2025
Introduced in House
Type: IntroReferral
| Source: Library of Congress
| Code: Intro-H
Aug 1, 2025
Introduced in House
Type: IntroReferral
| Source: Library of Congress
| Code: 1000
Aug 1, 2025
Subjects (1)
Armed Forces and National Security
(Policy Area)
Full Bill Text
Length: 2,830 characters
Version: Introduced in House
Version Date: Aug 1, 2025
Last Updated: Nov 15, 2025 2:11 AM
[Congressional Bills 119th Congress]
[From the U.S. Government Publishing Office]
[H.R. 4833 Introduced in House
(IH) ]
<DOC>
119th CONGRESS
1st Session
H. R. 4833
To require the Secretary of the Air Force to conduct planning and
design activities for Tye Gate and Arnold Gate infrastructure
improvements at Dyess Air Force Base, and for other purposes.
_______________________________________________________________________
IN THE HOUSE OF REPRESENTATIVES
August 1, 2025
Mr. Arrington introduced the following bill; which was referred to the
Committee on Armed Services
_______________________________________________________________________
A BILL
To require the Secretary of the Air Force to conduct planning and
design activities for Tye Gate and Arnold Gate infrastructure
improvements at Dyess Air Force Base, and for other purposes.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
[From the U.S. Government Publishing Office]
[H.R. 4833 Introduced in House
(IH) ]
<DOC>
119th CONGRESS
1st Session
H. R. 4833
To require the Secretary of the Air Force to conduct planning and
design activities for Tye Gate and Arnold Gate infrastructure
improvements at Dyess Air Force Base, and for other purposes.
_______________________________________________________________________
IN THE HOUSE OF REPRESENTATIVES
August 1, 2025
Mr. Arrington introduced the following bill; which was referred to the
Committee on Armed Services
_______________________________________________________________________
A BILL
To require the Secretary of the Air Force to conduct planning and
design activities for Tye Gate and Arnold Gate infrastructure
improvements at Dyess Air Force Base, and for other purposes.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
SECTION 1.
This Act may be cited as the ``Dyess Air Base Access Infrastructure
Design Act''.
SEC. 2.
DYESS AIR FORCE BASE, TEXAS.
(a) Tye Gate Design.--
(1) In general.--The Secretary of the Air Force shall carry
out planning and design activities for an infrastructure
project relating to the Tye Gate at Dyess Air Force Base,
Texas.
(2) Amount of project.--The infrastructure project for
which planning and design activities are required under
paragraph
(1) shall be for an amount not to exceed $17,000,000,
of which planning and design may not exceed seven percent.
(3) Design activities.--Design activities required under
paragraph
(1) may be based on standard Air Force gate designs
and shall consider minimal utility crossings, limited conflicts
with built infrastructure, and simplified phasing.
(b) Arnold Gate Design.--
(1) In general.--The Secretary shall carry out planning and
design activities for an infrastructure project relating to the
Arnold Gate at Dyess Air Force Base, Texas.
(2) Amount of project.--The infrastructure project for
which planning and design activities are required under
paragraph
(1) shall be for an amount not to exceed $12,065,000,
of which planning and design may not exceed eight percent.
(3) Design activities.--Design activities required under
paragraph
(1) shall account for site congestion, multiple
utility connections, phased construction, and complex traffic
coordination.
(c) Use of Existing Amounts.--The requirements under this section
shall be carried out using amounts otherwise made available to the
Department of the Air Force for planning and design under military
construction accounts.
<all>
(a) Tye Gate Design.--
(1) In general.--The Secretary of the Air Force shall carry
out planning and design activities for an infrastructure
project relating to the Tye Gate at Dyess Air Force Base,
Texas.
(2) Amount of project.--The infrastructure project for
which planning and design activities are required under
paragraph
(1) shall be for an amount not to exceed $17,000,000,
of which planning and design may not exceed seven percent.
(3) Design activities.--Design activities required under
paragraph
(1) may be based on standard Air Force gate designs
and shall consider minimal utility crossings, limited conflicts
with built infrastructure, and simplified phasing.
(b) Arnold Gate Design.--
(1) In general.--The Secretary shall carry out planning and
design activities for an infrastructure project relating to the
Arnold Gate at Dyess Air Force Base, Texas.
(2) Amount of project.--The infrastructure project for
which planning and design activities are required under
paragraph
(1) shall be for an amount not to exceed $12,065,000,
of which planning and design may not exceed eight percent.
(3) Design activities.--Design activities required under
paragraph
(1) shall account for site congestion, multiple
utility connections, phased construction, and complex traffic
coordination.
(c) Use of Existing Amounts.--The requirements under this section
shall be carried out using amounts otherwise made available to the
Department of the Air Force for planning and design under military
construction accounts.
<all>